The Esser Transition Assembly Kit

With the ESSER Assembly Kit, the entire transition area from the hopper to the deck will have an increased wear-life due to the steam hardening process that makes our Twin Cast 900 material unique within the industry. This allows us to expand on the proven reliability of the Esser reducers which have repeatedly shown the longest wearlife in the industry for over 20 years.

By offering our new Transition Assembly Kit we are giving you the option to use the best material available on the market today in one of the most critical areas of the pipeline system. From the hopper to the tip of the boom, Esser Twin Pipes can supply you with all of your pipeline system needs.




  • The Esser Twin Pipes Transition Assembly Kit was developed as an alternative to the traditional lower quality “backend kits” in the market today.
  • Our Transition Assembly Kit uses the proven Esser Twin Cast 900 technology to create yet another superior product.
  • By using our Transition Assembly Kit you can reduce operating costs by increasing the wear-life of the individual components.

147 Airpark Industrial Road  •  Alabaster, Alabama 35007  •  Phone: 205.621.2454  •  Fax 205.621.9739